| Petrobras – Palo Azul D Facilities |
 |
Azul constructed the Palo Azul D well and facilities site in Block 18. The project included detailed engineering, procurement, civil, mechanical, pipe ...
|
 |
|
|
 |
 |
 |
| Encana – Batata Well Location |
 |
This was a most difficult exploratory well location project in rough terrain in the rain forest jungle with an area of less than 1.5 hectares. It req ...
|
 |
|
|
 |
|
 |
 |
|
 |
 |
 |
| Occidental Petroleum (OXY) – Cocaya |
 |
This was the construction of the Cocaya Central, Cocaya 1, and North Sanisla exploration well locations. Work included design, clearing, earthwork, c ...
|
 |
|
|
 |
|
 |
|
|