 |
 |
 |
Kerr McGee / Perenco –Yuralpa
Construction of the access road and site for the Yuralpa Central Station and well location. The job included topographical work, design of the access road, clearing, earth moving, installation of wearing surface, slope stabilizations and additional civil work to accommodate structures and facilities such as the drilling rig, camp, cuttings ponds, oil/water separators, and storage warehouses. Tree canopies were preserved and excess soil from earth moving operations was carefully used in fill sections to avoid spoil areas. |
 |