 |
 |
 |
Occidental Petroleum (OXY) - Limoncocha
In addition to the 1000 person temporary construction camp which Azul designed, built and operated, Azul did the design and construction of the OXY 160 person CPF Permanent Camp. This camp had buildings and facilities elevated to prevent damage during flooding. The 4,800m2 construction included recreation and sports courts, access roads and parking lots, drainage systems, potable and waste water treatment, electrical, voice and data systems, fire detection and prevention systems, air conditioning, internal furniture and equipment, exterior fence and lighting, walkways and landscaping. The buildings had pre-fabricated and galvanized metallic structures. The inner partitions and exterior walls were of hollow brick and concrete block, plastered and finished with acrylic vinyl paint. The roof was pre-painted steel panel. |
 |