 |
 |
 |
Occidental Petroleum (OXY) Cocaya
This was the construction of the Cocaya Central, Cocaya 1, and North Sanisla exploration well locations. Work included design, clearing, earthwork, civil works and mat pavement. The sites were restored to their original state after drilling operations. Work included reforestation, drainage work and erosion control. All logistics and mobilization of personnel, equipment and materials was done by helicopter. The three well locations were constructed simultaneously to minimize helicopter costs. |
 |