Kerr McGee / Perenco – Yuralpa Power Plant

Basic to detailed engineering was done for this power plant project that uses generators with internal combustion engines fueled with crude oil. This project included civil, mechanical, electrical and process design to integrate different areas such as fuel treatment, lubrication and cooling. The detailed engineering was done using software of the latest technology which allowed a high quality product in a short time.

  CLIENT: Kerr McGee / Perenco LOCATION: Bloque 21, Napo, Ecuador
 PICTURE GALLERY
Kerr McGee / Perenco – Yuralpa Power Plant Kerr McGee / Perenco – Yuralpa Power Plant Kerr McGee / Perenco – Yuralpa Power Plant Kerr McGee / Perenco – Yuralpa Power Plant
 PROJECTS
Kerr McGee / Perenco – Sarayacu Pump Station
Sarayacu is a 55,000 BOPD capacity pump station that was designed and built in only 5 months -a very tight schedule. A group of excellent Azul profess ...

Petrobras – CPF Palo Azul Process Facility
The 40,000 BOPD Palo Azul Central Production Facility (CPF) project went from basic to detailed engineering. Best engineering practices were used as w ...

Encana – Dorine Phase V Process Facility
The Dorine Process Facility in Tarapoa was modified during its Phase V to become a 40,000 BOPD process facility. The engineering designs were develope ...

     Azul Copyright © 2007 powered by SOHO Design     
 
Azul has the copyright of all the information contained in this web site. No part of this information may be reproduced, stored in retrieval system, or transmitted in any form or by any means; digital, magnetic, electronic, mechanical, photocopying, recording without prior written approval of Azul.