>Engineering and Project Management >Kerr McGee / Perenco – Sarayacu Pump Station

Kerr McGee / Perenco – Sarayacu Pump Station

Sarayacu is a 55,000 BOPD capacity pump station that was designed and built in only 5 months -a very tight schedule. A group of excellent Azul professionals for each discipline and the constant coordination of activities with our client made this design-construction project a great success.

  CLIENT: Kerr McGee / Perenco LOCATION: Sarayacu, Napo, Ecuador
 PICTURE GALLERY
Kerr McGee / Perenco – Sarayacu Pump Station Kerr McGee / Perenco – Sarayacu Pump Station Kerr McGee / Perenco – Sarayacu Pump Station Kerr McGee / Perenco – Sarayacu Pump Station Kerr McGee / Perenco – Sarayacu Pump Station Kerr McGee / Perenco – Sarayacu Pump Station Kerr McGee / Perenco – Sarayacu Pump Station Kerr McGee / Perenco – Sarayacu Pump Station
Kerr McGee / Perenco – Sarayacu Pump Station Kerr McGee / Perenco – Sarayacu Pump Station Kerr McGee / Perenco – Sarayacu Pump Station
 PROJECTS
Kerr McGee / Perenco – Yuralpa Power Plant
Basic to detailed engineering was done for this power plant project that uses generators with internal combustion engines fueled with crude oil. This ...

Petrobras – CPF Palo Azul Process Facility
The 40,000 BOPD Palo Azul Central Production Facility (CPF) project went from basic to detailed engineering. Best engineering practices were used as w ...

Encana – Dorine Phase V Process Facility
The Dorine Process Facility in Tarapoa was modified during its Phase V to become a 40,000 BOPD process facility. The engineering designs were develope ...