The 40,000 BOPD Palo Azul Central Production Facility (CPF) project went from basic to detailed engineering. Best engineering practices were used as well as the latest software for process, mechanical, piping, civil, electrical and instrumentation and control. Coordinated designs were produced in real time. Data sheets and specifications for the acquisition of items such as separators, tanks, pressure vessels, pumps, switchgear, and others, were produced.

  CLIENT: Petrobras LOCATION: Bloque 18, Orellana, Ecuador
 PICTURE GALLERY
Petrobras – CPF Palo Azul Process Facility Petrobras – CPF Palo Azul Process Facility Petrobras – CPF Palo Azul Process Facility Petrobras – CPF Palo Azul Process Facility
 PROJECTS
Kerr McGee / Perenco – Yuralpa Power Plant
Basic to detailed engineering was done for this power plant project that uses generators with internal combustion engines fueled with crude oil. This ...

Kerr McGee / Perenco – Sarayacu Pump Station
Sarayacu is a 55,000 BOPD capacity pump station that was designed and built in only 5 months -a very tight schedule. A group of excellent Azul profess ...

Encana – Dorine Phase V Process Facility
The Dorine Process Facility in Tarapoa was modified during its Phase V to become a 40,000 BOPD process facility. The engineering designs were develope ...