Petrobras β CPF Palo Azul Process Facility
The 40,000 BOPD Palo Azul Central Production Facility (CPF) project went from basic to detailed engineering. Best engineering practices were used as well as the latest software for process, mechanical, piping, civil, electrical and instrumentation and control. Coordinated designs were produced in real time. Data sheets and specifications for the acquisition of items such as separators, tanks, pressure vessels, pumps, switchgear, and others, were produced. |
 |