Intranet »  
Home
>Engineering and Project Management >Encana – Dorine Phase V Process Facility

Encana – Dorine Phase V Process Facility

The Dorine Process Facility in Tarapoa was modified during its Phase V to become a 40,000 BOPD process facility. The engineering designs were developed based on Canadian standards according to the client's requirements. Hot work was performed in a safe manner and shutdowns were minimal. An exhaustive analysis of retention and separation times was carried out to optimize the skimming process. Construction and operation activities were closely coordinated to carry out HAZID and HAZOP studies and guarantee the reliability and security of the new facilities and compatibility with the existing facilities.

  CLIENT: Encana LOCATION: Bloque Tarapoa, Sucumbios, Ecuador
 PICTURE GALLERY
Encana – Dorine Phase V Process Facility Encana – Dorine Phase V Process Facility Encana – Dorine Phase V Process Facility Encana – Dorine Phase V Process Facility Encana – Dorine Phase V Process Facility
 PROJECTS
Kerr McGee / Perenco – Yuralpa Power Plant
Basic to detailed engineering was done for this power plant project that uses generators with internal combustion engines fueled with crude oil. This ...

Kerr McGee / Perenco – Sarayacu Pump Station
Sarayacu is a 55,000 BOPD capacity pump station that was designed and built in only 5 months -a very tight schedule. A group of excellent Azul profess ...

Petrobras – CPF Palo Azul Process Facility
The 40,000 BOPD Palo Azul Central Production Facility (CPF) project went from basic to detailed engineering. Best engineering practices were used as w ...

     Azul Copyright © 2007 powered by SOHO Design     
 
Azul has the copyright of all the information contained in this web site. No part of this information may be reproduced, stored in retrieval system, or transmitted in any form or by any means; digital, magnetic, electronic, mechanical, photocopying, recording without prior written approval of Azul.