Intranet »  
Home
>Construction and Erection >Roads and Bridges

Roads and Bridges

At Azul, we have worked on some of the toughest road and bridge construction projects in the Amazon Jungle and the Andes Mountains. We have provided the design work and constructed numerous projects through the years.

 
 PROJECTS
Kerr McGee / Perenco – Block 21Access Road
Azul built 35km of access road to Block 21 which included earthwork and the construction of 15 bridges. A new clearing technique was employed to minim ...

Occidental Petroleum (Oxy) – Paka
Construction of the Paka access road and well location. This job included clearing, earthmoving, gravelling, concrete works, drainage systems and oil/ ...

Kerr McGee / Perenco –Yuralpa
Construction of the access road and site for the Yuralpa Central Station and well location. The job included topographical work, design of the access ...

City Oriente – Blanca
Construction of the Blanca A and Blanca C access roads and well locations. Both jobs required 24 hours per day work. Well locations included structure ...

     Azul Copyright © 2007 powered by SOHO Design     
 
Azul has the copyright of all the information contained in this web site. No part of this information may be reproduced, stored in retrieval system, or transmitted in any form or by any means; digital, magnetic, electronic, mechanical, photocopying, recording without prior written approval of Azul.